Project Update 04/30/2018

The design of the Osceola Park Neighborhood Project is well underway and recently hit a milestone with delivery of the Preliminary Design Report to City staff. Some highlights of the efforts underway are:

The project components required to create the design drawings have been completed, including:

  • The land survey and base map drawings of the entire neighborhood;
  • Geotechnical engineering testing (exploration of the underground environment) to confirm the condition and extent of the existing roadway’s base course and right-of-way percolation;
  • Videotapes and condition reports of the existing sanitary and storm sewers to ensure that system repairs re-establish the local level of service; and,
  • The traffic calming pilot projects and study with preliminary findings provided to City staff.

Coordination with area utilities including FPL, FPL Fibernet, AT&T, Comcast and Florida Public Gas Company are underway to ensure that potential conflicts are identified and accounted for; and,

The next public outreach meeting is tentatively planned for fall (November time frame) to share the design progress with the community and seek additional input prior to wrapping up the final design documents and bidding for the project’s construction.