Crews are paving the 1st lift of Asphalt on SE 2nd Ave between SE 3rd St to SE 4th St. On SE 4th Ave between SE 2nd St to SE 3rd St, crews are installing new sidewalks & driveways, and at SE 4th Ave and SE 5th St, crews are cleaning up after the sewer main repair.